Automatic Brick Stacking Machine

Gongyi Fuwei Heavy Machinery Plant

  • Automatic Brick Stacking Machine0
Наведите на изображение, чтобы его увеличить
16-01-13
L/C, T/T
wooden pallet

Данные Товара

1. Whether it is right and ground wire is firm, add hydraulic oil to the middle of the ruler. It uses 46 # wear-resisting hydraulic oil. 2. The travelling gear's tracks must be corrected the level, and the suggested track is using 24 kg/m. The centers of adobe cutting machine, adobe separating machine and swivel plate must be aligned with the center of clamp adobe machine. 3. Clamp adobe machine should be corrected after installation, making the traveller vertical, correcting the clamp adobe machine's level. Correct rail cylinder and the rail, making them in parallel.